TRRO579-2026 CHIEF ENGINEER: STORM WATER NETWORK PLANNING

Date: 21 Sept 2026

Location: C De Wet Depot, C De Wet Depot, ZA, C De Wet D

Company: City of Tshwane

DEPARTMENT: ROADS AND TRANSPORT

Division: Transportation Planning

Section: Transport Infrastructure Planning 

Location: C De Wet Depot

 




Reference number

TRRO579-2026

 

Position

CHIEF ENGINEER: STORM WATER NETWORK PLANNING 

 

To be advertised

Internal

External

 

This position seeks to attract

African female

African male

Coloured female

Coloured male

Indian female

Indian male

White female

White male

Person with disability

All categories

 

Job level

T16

 

Scale

R766 044,00 – R1 063 932,00 per annum

 

Estimated

remuneration package

R1 006 965,00 – R1 386 121,00 per annum

 

Job purpose

To assist in the execution of professional storm water management services for all storm water drainage systems falling within Tshwane to enhance public safety, protect property from flooding and improve the quality of life of all communities

 

Appointment 

requirements

An appropriate three-year career-related tertiary qualification (degree or national diploma) in Civil Engineering or in a study field related to the position

Registration as Professional Engineer or Professional Engineering Technologist in terms of the Engineering Profession Act, 2000 (Act 46 of 2000)

At least seven years’ relevant experience in a storm water systems planning environment

Managerial experience will be an added advantage

A valid Code B driving licence

Computer literacy

Must undergo a criminal record check and such a person shall allow their fingerprints to be taken by the Tshwane Metro Police Department at own cost

 

Personal attributes

and/or competencies

Having integrity and intelligence; being patient; innovative thinking skills; having energy and imagination; flexibility; willingness to accept responsibility; decisiveness; ability to pay attention to detail

 

Primary functions

Plan all storm water drainage networks in Tshwane

Establish and update storm water master plans for all catchments

Identify drainage needs and problems, prepare alternative solutions and

preliminary designs, executive feasibility studies and compile a list of proposed projects to address the needs

Oversee and evaluate the impact of proposed new developments or changes in land use on all drainage systems

Verify the design and plans of all private developments for compliance with City of Tshwane policy, norms and standards

Provide a calculation method to calculate storm water bulk contributions and development charges payable by private developers to recover municipal expenditure on providing storm water runoff from new developments

 

SAP

S70008776

 

 

New/natural attrition

Natural attrition 

 

Enquiries

P Odendaal (012 358 7995) or M De Wijn (012 358 7696)